|
|
 |
|
|
ALLELYS HEAVY HAULAGE LTD |
|
| |
|
|
|
|
Allelys.. In Action (2)
The movement of construction plant both new and old presents little difficulty, with a wide range of trailers being available.
|
At over 7m high, 4m wide and 22m long, special arrangements had to be made to have telephone and power lines lifted over the 15 mile route from Dover Docks to Cheriton, in order to allow the passage of these Euro-Shuttle vehicles for the channel tunnel.
|
|
|
|
|
|
 |
|
 |
|
back
|
|
|